
Engineering Excellence Honor Award
American Council of Engineering Companies
Lake Brazos Labyrinth Weir, City of Waco
The labyrinth weir replaced a gated spillway and was constructed on a flowing river, over the foundation of the existing dam, without expanding the dam's footprint or rerouting the river during construction at nearly half the cost of earlier estimates.